HXKS-150 high speed paper cup machine

HXKS-150 automatic fast paper cup machine is used to produce single-sided and double-sided PE coated paper cups. It can manufacture hot and cold drink paper cups, coffee cups, ice cream paper cups and other food paper containers.

Products Details

The sheet-making conveyor belt is the supporting equipment of the paper cup forming machine. It is installed on the forming machine for the conveying of the fan-shaped sheet, which can reduce the frequency of paper feeding by workers per unit time and achieve the purpose of saving labor costs.1. We guarantee any de1. This instruction manual will be sent with the machine to guide the work of the installation process, adjust the machine, produce, avoid or solve problems faced by the buyer. 2. Trial run and training of the machine: A.we will make a complete adjustment to the machine one week before delivery to ensure that the machine achieves the desired performance. B.we provide the buyer with free training in our factory. The training will not stop until the buyer controls the whole course! The travel expenses shall be borne by the buyer (on-site installation instruction, auxiliary debugging, daily maintenance, maintenance personnel training) . 3. We provide one-year free supplies accessories, freight borne by the buyer, free warranty for one year.

Paper cup specifications

2-16oz

Production speed

120-150pcs/min

Machine net weight

5000kg

Power supply

380V/50HZ

Air consumption

0.4m/min

Power

The total power is 21KW, and the test run is 12.5kw

Appearance size

L3300mm*W1650mm*H1900mm

Paper specifications

160-350gsm

Paper cup bonding method

Ultrasonic bonding

Paper type

Single PE/double PE/PLA

We can customize the machine and mould according to customer's requirements

1. This instruction manual will be sent with the machine to guide the work of the installation process, adjust the machine, produce, avoid or solve problems faced by the buyer. 2. Trial run and training of the machine: A.we will make a complete adjustment to the machine one week before delivery to ensure that the machine achieves the desired performance. B.we provide the buyer with free training in our factory. The training will not stop until the buyer controls the whole course! The travel expenses shall be borne by the buyer (on-site installation instruction, auxiliary debugging, daily maintenance, maintenance personnel training) . 3. We provide one-year free supplies accessories, freight borne by the buyer, free warranty for one year.Optical detection of the running status of various parts, to maintain the normal operation of the machine. Automatic rejection function when boot.1. Fects in design and workmanship within one year from the date of shipment. 2. Up to about 67,000 cups are produced on eight-hour Shifts, or about 5,025,000 cups a month on three shifts (20 hours a day given the machine's protection) . 3. In normal production, the qualified rate is higher than 99% . 4. An operator can handle multiple machines at the same time . 5. The mechanical transmission part is guaranteed for 5 years, and the whole machine can be repaired free of charge within one year if there is any problem (not including any damage caused by abuse, improper operation, neglect and other reasons beyond our responsibility) .